Numbersort descending Name Town Description Decision Date
645 M2 O.B. Bowling Alley Conditions Modification Oak Bluffs Proposal to modify some of the conditions in the DRI 645 Decision relative to hours of operation, lighting, amplified music, and capacity. June 2, 2016
645 M3 Barn, Bowl Bistro Request Temp. Conditions to be Permanent Oak Bluffs Request by Barn, Bowl & Bistro to make the temporary conditions that the MVC approved last year permanent.
645 M4 Barn Bowl & Bistro Kitchen Addition Oak Bluffs Proposal to construct an addition to the kitchen. April 5, 2018
645 M6 Barn Bowl & Bistro Pick-Up Window Oak Bluffs Proposal to add a take-out window April 9, 2020
645 M7 Barn, Bowl & Bistro Outdoor Seating Oak Bluffs Proposal to have outdoor seating during the summer months while indoor dining is not allowed due to COVID-19.
646 Cook Road New Mixed Use Building (Petro Tech) Tisbury (Vineyard Haven) To construct a two-story 4,500 sf (3,000 sf footprint) building with a truck repair garage and office on the ground floor and an apartment (1,500 sf) on the second floor.
646 M Cook Road New Building Tisbury (Vineyard Haven) 3,000 sf footprint steel commercial building with a 900 sf basement and 1,500 sf workforce apartment.
647 IHT Water St. Apartments Tisbury (Vineyard Haven) Proposal to demolish and existing house and build a 6 unit affordable housing building. The property was previously DRI 616 which was surrendered. this proposal was sent as a Concurrence Review which was accepted for review as a DRI. July 17, 2014
647 M IHT Water Street Apartments - Modification Tisbury (Vineyard Haven) Modification
648 Brennan Mixed-Use Mariner's Landing Edgartown Construction of 2 story building with four 2,000 sf commercial condominiums on the ground floor and eight 1,000 sf residential condominiums on the second floor and a full basement in the Edg. B-2 Commercial District. November 6, 2014
648 L Mariner's Way Landscaping & Lighting Edgartown Landscaping, Lighting and HVAC placement plans
648 M Mariner's Way Restaurant Edgartown Change of use from office space to quick-service restaurant with 20–30 seats.
649 Mal Jones Tidal Reef/Barge Edgartown Proposal to temporarily sink a barge off of Wasque Point to create a sandbar that stems the erosion of that section of the island.
649 Mal Jone's Tidal Reef/Barge Edgartown Proposal to temporarily sink a barge off of Wasque Point to create a sandbar that stems the erosion of that section of the island.
651 Masonic Ave. Historic Demolition Oak Bluffs Proposal to demolish the house on Masonic Avenue formerly known as the Bradley Memorial Church (built circa 1895), also called the Denniston House. The owner wishes to clear the site and has no current plans to build anything else on the property.
652 Island Source Airport Storage Edgartown To construct a 20,625 sf one-story storage facility with 151 units of various sizes. June 18, 2015
653 Dias High Point Lane Tisbury (Vineyard Haven) To construct a 60’ by 60’ two-story metal building for wholesale lumber storage, an office, and an apartment. October 1, 2015
653 M Dias Mixed-Use High Pt. Lane Tisbury (Vineyard Haven) Construction of a 25,200 sf 3-story warehouse building with 2 studio apartments and a showroom. The Building would be two stories facing on High Point Lane and three stories tall (35') on the interior of the site which would be warehouse space with stacking open to the ceiling. June 2, 2016
653 M DRI 653-M-Dias Mixed Use High Point Lane Tisbury (Vineyard Haven) To construct a three-story mixed-use building with an 8,400 sf footprint. The building will consist of two sections: (1) a mixed-use section on High Point Lane and (2) a warehouse in the back. The front section on High Point Lane will have a 1,680 sf footprint (28’ by 60’) comprised of office and storage on the basement level, a showroom on the High Point Lane ground floor, and two apartments on the 2" floor. The warehouse section in the back is open three stories to the ceiling with a 6,720 sf footprint (112’ by 60'). June 2, 2016
653 M3 Dias Wastewater Modification Tisbury (Vineyard Haven) To modify condition requiring installation of composting toilets in the upstairs apartments. July 12, 2018
656 DeBettencourt Garage High Point Lane Tisbury (Vineyard Haven) Major topographical alteration to prepare a site for a 5,166 gsf (4,500 sf footprint) vehicle repair garage with three repair bays able to accommodate trucks, a vehicle inspection station, offices, waiting area, and storage
657 Polly Hill Education Center West Tisbury Demolition of an 1870's barn and construction of a 2,650 s.f. two-story education center with classrooms, botany lab, herbarium, and offices. September 17, 2015
658 Beach Street Demolition Edgartown Demolition of a two-story house built in 1890 and replacement with a house of similar design. October 1, 2015
659 North Bluff Sea Wall Oak Bluffs Provide enhanced coastal storm protection against projected sea level rise by creating a stone revetment (3-4 ton), raised sheet metal seawall (4’ higher than the existing concrete sea wall), restored coastal bank and construct a timber boardwalk to provide a pedestrian link between the SSA Ferry Facility and the Oak Bluffs Harbor. January 7, 2016
659 M North Bluff Modification Oak Bluffs Modification to North Bluff Seawall project, including roundabout and parking. December 15, 2022

Pages

Office location:

Office location:

The Stone Building
33 New York Avenue
Oak Bluffs, MA 02557

Telephone: 508-693-3453
Fax: 508-693-7894

Mailing Address

Mailing address:

Martha's Vineyard Commission
P.O. Box 1447
Oak Bluffs, MA 02557

Site Map

Copyright

© 2008 - 2024
Martha's Vineyard Commission
All Rights Reserved