Active DRIs

Number Name Town Description Status Decision Date
81 M2 Harborwood 40B Multi-Unit Apartments Tisbury (Vineyard Haven) Proposal to develop 52 residential units and approximately 5,500 square feet of commercial space on the site of the former Hinckley's Hardware through a Comprehensive Permit (40B). Under Review
248 M3 North Tabor Farm Staff Housing Chilmark Construction of a two-bedroom apartment in an existing barn in order to provide housing for farm employees. Under Review
250 M 222 Upper Main Street Change of Use Edgartown Conversion of an existing residence to a 19-room inn in the BII District, including site work to provide for parking and access requirements, limited demolition, and construction of a new addition to the main building. Under Review
314 M MV Shipyard Expansion Tisbury (Vineyard Haven) Proposed Shorefront Improvements: installation of two piers/ramps/floating dock systems, and two finger floats adjacent to the existing boat ramps; zone of float reconfiguration; offshore pile installation; re-dredging in a previously dredged area. Proposed Upland Improvements: removal of two existing warehouse buildings; re-grading; construction of a smaller warehouse (within footprint of the removed buildings and existing parking area); formalize parking. Under Review
345 M5 Island Cove Apartments Tisbury (Vineyard Haven) Mixed-use building with 54 residential rental units and 2,000 square feet of commercial space, and 53 parking spaces. Under Review
352 M4 2020 MVRHS Athletic Fields Oak Bluffs Proposal to install new athletic field facilities at the Martha's Vineyard Regional High school. Under Review
365 M Airport Business Park Expansion Edgartown Expansion of the Airport Business Park to include five new parcels totaling 8.78 acres. Under Review
429 M2 Edgartown Stop & Shop Expansion Edgartown Proposal to construct approximately 17,432 sf of additions to the existing 25,259 sf main Stop & Shop Supermarket building plus the demolition and reconstruction of a slightly larger Rockland Trust Bank building and significant site work. Approved January 25, 2018
484 M10 Vineyard Golf Club Maintenance Facility Edgartown Expansion of existing turf maintenance building, including the addition of nine employee bedrooms; and construction of a new building for equipment and chemical storage. Under Review
484 M11 Vineyard Golf Club Condition 4b Edgartown To modify Condition 4b of the original 1999 approval of the Vineyard Golf Club (DRI 484) in regard to the makeup and function of a required review committee, and the purpose of a required annual monetary contribution. Under Review
532 M4 Carroll's Trucking Campus Plan Tisbury (Vineyard Haven) Proposal to update the Carroll's Trucking site, including adding a new storage building, renovating the existing buildings and reception area, and significant site improvements. Approved August 22, 2019
550 M4 Mansion House Parking Tisbury (Vineyard Haven) Repurposing of two lots on Cromwell Lane for Mansion House parking. Under Review
561 M2 Old Courthouse Road Tower Modifications - Generator West Tisbury Installation of a 30KW diesel generator. Under Review
561 M Old Courthouse Road Tower Modifications West Tisbury Modifications to existing cell phone tower and ground equipment. Approved October 1, 2020
566 M5 Island Energy Relocation Edgartown Relocation of office and service operation from 44 Evelyn Way in Tisbury to 7 North Line Road in Edgartown (Airport Business Park), while maintaining one existing storage tank and one parking space at 44 Evelyn Way and renting the rest of the property to Bartlett Tree. Under Review
614 M7 Harbor View Hotel Modifications 2020 Edgartown Changes to the 2018 approval of the modifications to the main hotel and cottages Under Review
674 M Old Stone Bank Condos Tisbury (Vineyard Haven) Proposal to renovate the two existing buildings on the property and construct five new buildings for a total of 11 condo units and six commercial units. Approved
678 M Oak Bluffs Town Hall Modifications Oak Bluffs Modifications to the proposed Town Hall originally approved in 2017 Approved
682 A Meeting House Place Subdivision Re-design Edgartown Previously DRI 682; revised proposal to create 28 residential lots and up to 10 income-restricted townhouses on 54 acres. Denied
682 B Meeting House Way 2nd Redesign Edgartown This is a Form C definitive subdivision proposal to take 5 parcels spanning 54 acres and subdivide into 28 single family residences with 14 townhouses on the 29th proposed lot. Denied
682 Meeting House Way Subdivision Edgartown Proposed 36-home residential subdivision on 54 acres. Denied
690 Wampanoag Gaming Facility Aquinnah (Gay Head) Construction of a 10,000 "sprung" structure Denied July 11, 2019
691 Eversource Energy Storage System (ESS) Oak Bluffs Construct a 14.7-megawatt energy storage system (ESS) in two phases at the existing Eversource service center. Phase one would consist of a new 7,600 square foot building; phase two would be another 6,840 square foot building. Both structures would house lithium-ion battery storage modules, a power conversion system, a control and protection system indoors, and step-up transformers, switchgear and HVAC units outside the structure shielded on three sides by a 10 foot noise attenuating wall. Withdrawn
693 M2 Mill House Gas Range Tisbury (Vineyard Haven) Modification of DRI 693 to allow for gas range. Under Review
693 29 Mill House Road Historic Demolition Tisbury (Vineyard Haven) Proposal to significantly modify the exterior of a historic structure built in 1750. Approved October 3, 2019
694 Caleb Prouty House Historic Demolition Tisbury (Vineyard Haven) Proposal to demolish a house built in 1828. Under Review
696 Fine Fettle Recreational Dispensary West Tisbury Proposal to operate a recreational marijuana facility at the existing registered marijuana dispensary. Approved September 10, 2020
697 Hob Knob Expansion Edgartown Proposal to construct an addition to the existing site (128 Upper Main St) and expand to a new site (124 Upper Main St); total number of guest rooms would increase from 17 to 35. Denied
699 Tisbury Marine Terminal Tisbury (Vineyard Haven) Repairs and alterations to existing marine infrastructure, and construction of an operations and maintenance facility for offshore wind support. Under Review
701 Main Street Medicinals Tisbury (Vineyard Haven) Proposal to convert the existing 4,900 sf building to a Registered Marijuana Dispensary and Recreational Marijuana Establishment with a 600 sf addition. Under Review
702 122 Lighthouse Road Aquinnah (Gay Head) Proposal to enclose approximately 140 square feet of an existing deck of a historic house listed on MACRIS. Under Review
703 AmeriGas Relocation Edgartown Relocation of AmeriGas business, including two 30,000-gallon propane tanks, from 7 North Line Road to 6 North Line Road at the Airport Business Park. Under Review
704 112 Dukes County Ave. Demolition Oak Bluffs Demolition of a historic two-story home (already completed) and construction of a new three-story home just outside the Cottage City Historic District. Under Review
705 Star Propane Edgartown Addition of one 30,000-gallon propane tank, for a total of 80,000 gallons to be stored onsite (plus 110 gallons of methanol). Under Review
22021 Casaltamar Form A Subdivision Chilmark Division of Map 2, Parcel 2, into two lots. Under Review
42021 Michael Hand ANR Edgartown ANR division of one lot into two conforming lots with shared access Under Review
52021 189 Katama Road Demolition Edgartown Demolition of a single-family residence more than 100 years old. Under Review
72020 Seafood Shanty Seating Edgartown Increase in occupancy load from 332 to 410 seats Under Review

Office location:

Office location:

The Stone Building
33 New York Avenue
Oak Bluffs, MA 02557

Telephone: 508-693-3453
Fax: 508-693-7894

Mailing Address

Mailing address:

Martha's Vineyard Commission
P.O. Box 1447
Oak Bluffs, MA 02557

Site Map

Copyright

© 2008 - 2021
Martha's Vineyard Commission
All Rights Reserved