Previous DRIs

Numbersort descending Name Town Description Decision Date
660 Oak Bluffs Water District Solar Farm Oak Bluffs Revised proposal to construct a 1.46 +/- MW Solar Farm within a cleared area of 10.37 acres between Well # 3 and Well # 4 on O.B. Water District property containing wells 3, 4, & 5. The solar panels would be in the Zone 2 Area of Contribution with some clearing in two Zone 1 Areas of Contribution.
661 Squibnocket Parking Lot Relocation Chilmark Relocation of the Squibnocket Beach parking lot inland from the existing revetment which will be the subject of beach restoration. The project consists of beach restoration, parking lot, roadway and utility relocation. The project is being reviewed concurrently with an abutting project by the Squibnocket Ridge Subdivision which is relocating their access road to a new 300 foot long causeway/bridge. April 28, 2016
662 Chappy Wireless Antenna Edgartown 2016 Approval Granted Extension 5/10/2018. To locate a wireless communications facility, including without limitation a 104-foot ballast mounted concealed antenna monopole with 3 guy wires and anchors, 3 panel antennas, a ground mounted dish antenna of 6 feet in diameter, coaxial cables, and 2 radio communications equipment cabinets to be located within an existing building. April 14, 2016
662 M Chappaquiddick Permanent Tower Edgartown Proposal to build a permanent 115 foot high monopole on same property as temporary tower. January 25, 2018
663 Phillips Hardware New Mixed-Use Building Oak Bluffs A proposal to demolish an existing (1 and 3 story) building to be replaced by a three-story mixed-use building on Circuit Avenue.
663 M Phillip's Modification to Apartment Use Oak Bluffs Proposed modification to change the approved use of the residential portion of the project from “Hotel” to “Apartment”. February 15, 2018
663 M2 Phillips Hardware Mixed Use Roof Modification Oak Bluffs Proposal to alter the roof in the center of the building to be flatter and less elevated than the original design.
664 Featherstone Art Barn & Pottery Studio Oak Bluffs The proposal includes the demolition of two existing buildings (total app 3,330 sf) and the construction of two new bigger buildings with a total of 8,800 sf. The proposal includes the demolition of the art barn and the construction of a new bigger Art Barn with offices, classrooms, a commercial kitchen, and a gallery and a new pottery studio at the Featherstone Center for the Arts.
665 M.V. Museum @ Marine Hospital Tisbury (Vineyard Haven) Phase 1: Renovation of existing 3-story 10,525 sf Marine Hospital built in 1895 with a 2-story 4,738 sf new "Fresnel Pavilion" and related site work AND Phase 2: new 2-story 9,983 sf gallery wing and 2-story 848 sf connector building. The Proposal also includes the demolition of the 1935 brick addition to the Marine Hospital. May 30, 2017
665 M MV Museum Tisbury (Vineyard Haven) Modifications to the M.V. Museum site plan based upon adjustments to archaeological features discovered during the excavation and construction process. June 21, 2018
667 Beryl Way Historic Demolition Oak Bluffs Proposal to demolish a 650 sf former MVCMA Campground Cottage built in 1875.
668 Airport Fire Station West Tisbury Proposed replacement building for the Fire Station and Snow Removal Equipment at the Airport.
669 Sydney Hotel Expansion Edgartown Construction of new addition on vacant lot with 14 rooms, employee housing and 2 retail shops to the existing Sydney Hotel (location of l'etoile restaurant) January 5, 2017
670 Lampost Conversion Oak Bluffs Conversion of upper floors from night club to employee housing.
670 M Lampost Workforce Housing Reconfiguration Oak Bluffs Proposed reconfiguration of workforce housing units on upper floors. June 14, 2018
671 Rivera ANR Chilmark Proposed fourth ANR division of land on a piece of property that was 20.7 acres in 1980.
672 Damroth Subdivision Chilmark 4 Lot Subdivision of 14 Acres July 6, 2017
673 Mayhew Subdivision Chilmark 4 Lot Subdivision of 13.62 acres April 6, 2017
674 Santander Historic Roof Tiles Tisbury (Vineyard Haven) DRI Review of removal of historic clay tiles replaced by asphalt shingles on 111 year old iconic stone building. July 6, 2017
674 M Old Stone Bank Condos Tisbury (Vineyard Haven) Proposal to renovate the two existing buildings on the property and construct five new buildings for a total of 11 condo units and six commercial units. May 13, 2021
674 M2 Old Stone Bank Condos Modification of Decision Tisbury (Vineyard Haven) Modification of Condition 2.1 from the DRI 674-M Decision recorded on May 14, 2021.
674 M4 Stone Bank Condos Modifications Tisbury (Vineyard Haven) Modifications including elimination of second floor of drive-through building, elimination of rooftop solar panels, and addition of a deck and balcony.
675 Westman Historic Demolition 29 Franklin Tisbury (Vineyard Haven) To be permitted to demolish a Greek revival house in Tisbury built in 1850. July 6, 2017
677 Verizon Tower Height Extension Tisbury (Vineyard Haven) Height of Verizon Tower used to transmit landline calls and Internet access via narrow width microwave between Vineyard Haven and Falmouth (also handles Nantucket) will be increased from 77 feet above ground level to 130 feet ± above ground. July 11, 2019
678 O.B. Town Hall Oak Bluffs To demolish the existing Town Hall and construct a new 3-story 21,000 G. S.F. Town Hall (w/partial basement) on the same site. November 2, 2017

Pages

Office location:

Office location:

The Stone Building
33 New York Avenue
Oak Bluffs, MA 02557

Telephone: 508-693-3453
Fax: 508-693-7894

Mailing Address

Mailing address:

Martha's Vineyard Commission
P.O. Box 1447
Oak Bluffs, MA 02557

Site Map

Copyright

© 2008 - 2024
Martha's Vineyard Commission
All Rights Reserved