631 Tisbury Farm Market Tisbury (Vineyard Haven) To demolish one of two buildings, rebuild it to be larger, and connect it to and renovate the other existing building at to house a 7,400 square foot grocery and four 1-bedroom apartments on the second floor. May 23, 2011
631 M Tisbury Farm Market Expansion Tisbury (Vineyard Haven) To modify a 2011 MVC DRI Decision to now include the demolition of the concrete-block building in the back (5,360 sf) to be reconstructed as a two-story, 35 foot tall building with a full basement. March 22, 2012
631 M2 Cape Cod Five - High Point Lane Tisbury (Vineyard Haven) The proposal is to demolish both existing buildings at 412 State Road and build a single one-story bank building with a two-lane drive through. June 4, 2015
631 M2 - X Cape Cod Five Bank Building - Extension Request Tisbury (Vineyard Haven) Extension Request
632 Kidder Form A - Chappy Edgartown Form A August 4, 2011
632 M Kidder Lot Line Change Edgartown Minor adjustment of lot lines April 26, 2012
633 Oak Bluffs Roundabout Oak Bluffs Conversion of a 4-way stop to a roundabout November 3, 2011
635 MVTV New Building Oak Bluffs To construct a 6,600 s.f. Community Media Center, with attached 620 s.f. garage, to serve as the new headquarters for MVTV. January 26, 2012
635 M MVTV Reduction Oak Bluffs Reduction in size of approved building from 6,600 sf to 4,000 sf. June 21, 2012
635 M2 MVTV Landscape Plan & Driveway Realignment Oak Bluffs Shifting parking away from building and other slight changes to driveway and final review of landscaping plan June 3, 2013
635 M3 MVTV Mod. to pave part of driveway Oak Bluffs Modification to allow paving approximately 105 linear feet of the driveway. August 7, 2014
636 Town Provision/Airport Liquor Edgartown To build a 2,700 sf addition to the Nectar’s/Flatbread building near the airport to house a liquor store. April 26, 2012
637 Leaf Mixed Use Edgartown To remove an existing residential house and guest house at 284 Upper Main Street and replace them with a three-story mixed-use building. June 18, 2012
637 2 Leaf Mixed-Use Revisited Edgartown To remove an existing residential house and guest house at 284 Upper Main Street and replace them with a three-story mixed-use building. September 27, 2012
638 Rymes Propane Tisbury (Vineyard Haven) To locate a propane distributor in the Tisbury B-II District June 21, 2012
639 Tisbury Wharf Dredge Tisbury (Vineyard Haven) To dredge approximately 5,600 cubic yards of material from an 81,000 sf area on Vineyard Haven Harbor. October 24, 2013
640 Verizon W.T. Cell Tower - Doane West Tisbury 80 foot tall wireless cell tower April 11, 2013
640 M 21 New Lane Cell Tower Modifications West Tisbury Extension of existing camouflaged cell tower, and addition of equipment including antennas, a walk-in cabinet, and diesel generator.
640 M2 21 New Lane Cell Tower Modifications (Verizon) West Tisbury Modification of ground-based and tower-mounted equipment.
641 Comcast/NSTAR Hybrid Undersea Cable Tisbury (Vineyard Haven) To install an approximately 4 .5 mile long undersea hybrid fiber optic and electric cable from Falmouth to Martha’s Vineyard that will supply both power and fiber-optic cable capability. April 4, 2013
641 M Comcast/NSTAR Cable HDD Change Tisbury (Vineyard Haven) In the event that the 3000 foot HDD becomes problematic due to obstacles that they can not overcome, they would like regulatory agencies to provide a contingency that a shorter HDD could be utilized. January 9, 2014
642 NSTAR Poles Edgartown NSTAR installation of new and replacement poles larger in height and diameter with more extensive cutting and trimming of trees in Tisbury, Oak Bluffs, & Edgartown. NSTAR Right of Way in Tisbury; Edgartown-Vineyard Haven Road from the Edgartown Bank to about County Road; along the eastern edge of the State Forest, Edgartown-West Tisbury Road towards downtown Edgartown, turning back up Edgartown-Vineyard Haven Road. October 3, 2013
644 Fuller Landscaping Containers West Tisbury To locate eight storage containers (20’L X 8’W X 8.5’H) on a property in the West Tisbury Light-Industrial Zone for storage of landscape equipment and materials. October 24, 2013
645 Bowling on Uncas Ave Oak Bluffs To demolish several buildings on four lots and build a 13,500 s.f. bowling alley with 10 lanes, a 44 seat restaurant, 18 seat bar, game room, event room, 2 affordable apartments, and a 32 car parking lot. March 6, 2014
645 M Oak Bluffs Bowling - Denitrification - Connection to Sewer Oak Bluffs Proposal to modify the decision approving DRI 645 to allow connection to the Oak Bluffs town sewer rather than install on-site denitrification.

Pages

Office location:

Office location:

The Stone Building
33 New York Avenue
Oak Bluffs, MA 02557

Telephone: 508-693-3453
Fax: 508-693-7894

Mailing Address

Mailing address:

Martha's Vineyard Commission
P.O. Box 1447
Oak Bluffs, MA 02557

Site Map

Copyright

© 2008 - 2024
Martha's Vineyard Commission
All Rights Reserved