The following proposals are currently under review.
| Number |
Name |
Town |
Description |
Land Use |
MVC Action |
Referred |
Voted |
| 89 M3 | Stop & Shop Expansion | Vineyard Haven | To consolidate four abutting properties downtown resulting in the expansion of the Stop & Shop Supermarket and the removal of all other uses on site. The preliminary proposal is an approximately 24,000 sf Stop & Shop Supermarket with 43 parking spaces. | | | 2/13/2013 | |
| 621 M | O.B. Harbor Fuel Facility | Oak Bluffs | To install one 10,000 gallon gas tank in front of the Harbor Master's shack in order to provide a fueling station for recreational and commercial boats. The tank would be located beneath the parking lot and the fueling would take place on the floating dock just north of the Harbor Master shack. | | | 2/13/2013 | |
| 0 | CR 1 - 2013: Carroll Marine Demolition | Vineyard Haven | To demolish a commercial builing over 2,000 sf | | | 2/13/2013 | |
| 641 | Comcast/NSTAR Hybrid Undersea Cable | Tisbury | To install an approximately 4 .5 mile long undersea hybrid fiber optic and electric cable from Falmouth to Martha’s Vineyard that will supply both power and fiber-optic cable capability. | | | 1/18/2013 | |
| 411 M | Barnes Evelyn Way | Tisbury | To construct a 2,310 sf (32’ high) metal warehouse addition on a one-acre property with an existing 5,600 sf metal warehouse (2 Sections) and a dwelling. | | | 12/7/2012 | |
| 640 | Verizon W.T. Cell Tower - Doane | West Tisbury | 80 foot tall wireless cell tower | | | 10/16/2012 | |
| 124 M3 | Plum Bush Pont Homesite Lot | West Tisbury | Subdivide one 4.1-acre lot into on 3.1-acre lot and one 1-acre homesite lot. | | remand to town | 9/25/2012 | 1/10/2013 |
| 639 | Tisbury Wharf Dredge | Tisbury | To dredge approximately 5,600 cubic yards of material from an 81,000 sf area on Vineyard Haven Harbor. | | on hold at applicant's request | 7/2/2012 | |
| 603 M2 | Nova Vida/ Alliance Church Expansion | Oak Bluffs | To build a 6,500 s.f. footprint addition designed to house a 150 seat church and associated activity and classrooms on a property that has a three-story building with a 2,560 s.f. footprint and houses a 28-child daycare and was approved for a 150 seat church in the existing building. | | | 4/11/2012 | |
| 634 | Lagoon Ridge Subdivision | Oak Bluffs | Subdivion of 64 acres | | on hold at applicant's request | 6/29/2011 | |
| 629 | Barnes Gas Station | Tisbury | locate a gas/diesel filling station at 392 State Road in Tisbury. | | withdrawn | 10/19/2010 | 1/14/2013 |
| 622 | Grillo 10 State Road | Tisbury | To build a new three-story 5,655 gsf mixed use building and a new two-story 1,152 sf 2-bedroom cottage on a property in the B-1 District behind an existing 1,920 sf building on the same property. | | approved | 1/28/2010 | 1/10/2013 |
| 89 M3 | Stop & Shop Expansion | Vineyard Haven | Large Expansion of Downtown Vineyard Haven Stop & Shop (Plans Pending) | | | | |