674 Santander Historic Roof Tiles Tisbury (Vineyard Haven) DRI Review of removal of historic clay tiles replaced by asphalt shingles on 111 year old iconic stone building. July 6, 2017
672 Damroth Subdivision Chilmark 4 Lot Subdivision of 14 Acres July 6, 2017
675 Westman Historic Demolition 29 Franklin Tisbury (Vineyard Haven) To be permitted to demolish a Greek revival house in Tisbury built in 1850. July 6, 2017
618 M2 Medical Marijuana Cultivation Building West Tisbury Proposal to establish a Registered Medical Marijuana grow operation with modifications to a previously approved but not yet built building in the West Tisbury Light-Industrial District. NOTE: THE PROJECT WAS REVISED ON MAY 26, 2017 WITH THE DISPENSARY BEING REMOVED FROM THE PROPOSAL. July 13, 2017
678 O.B. Town Hall Oak Bluffs To demolish the existing Town Hall and construct a new 3-story 21,000 G. S.F. Town Hall (w/partial basement) on the same site. November 2, 2017
82017 Steele ANR Oak Bluffs ANR Division of one 0.44 acre lot in the B-1 District into two lots (one 12,361 sf lot and one 6,772 sf lot). January 11, 2018
429 M2 Edgartown Stop & Shop Expansion Edgartown Proposal to construct approximately 17,432 sf of additions to the existing 25,259 sf main Stop & Shop Supermarket building plus the demolition and reconstruction of a slightly larger Rockland Trust Bank building and significant site work. January 25, 2018
662 M Chappaquiddick Permanent Tower Edgartown Proposal to build a permanent 115 foot high monopole on same property as temporary tower. January 25, 2018
441 M3 Airport Gas Station Edgartown Construction of a new gas station and car wash at the site of the former Airport Mobil. January 25, 2018
352 M6 MVRHS Greenhouse Oak Bluffs Construction of a new greenhouse February 1, 2018
663 M Phillip's Modification to Apartment Use Oak Bluffs Proposed modification to change the approved use of the residential portion of the project from “Hotel” to “Apartment”. February 15, 2018
679 East Chop Bluff Repair Oak Bluffs The stabilization of approximately 2,400 linear feet of coastal bank located along East Chop Drive in Oak Bluffs. April 5, 2018
680 Old WT Town Hall/Library Demolition West Tisbury To demolish a building built in 1892 that has served in the past as the West Tisbury Town Hall and as a fire station. April 5, 2018
645 M4 Barn Bowl & Bistro Kitchen Addition Oak Bluffs Proposal to construct an addition to the kitchen. April 5, 2018
681 Green Ave Historic Demolition Edgartown Proposal to demolish the existing barn on the property, a portion of which may be considered historically significant, and attach a new garage to the existing home. April 12, 2018
271 M Dockside Inn Update Oak Bluffs To modify the description of the original 1988 DRI 271 Decision of an 18 guest room hotel with a managers apartment, 4 staff rooms and 9 parking spaces to match the existing 22 guest room hotel with a managers apartment and 6 on-site parking spaces. May 10, 2018
34 M3 Flat Point Farm Form B Preliminary Revised Estate Plan 2018 West Tisbury A revised Form B Preliminary Estate Plan that would create four new buildable lots (3 acres each), 5 lots around existing buildings (4-6 acres each) and place 60 acres in conservation on a 91.6 acre farm with four (4) existing buildable lots. May 24, 2018
532 M3 UPS Expansion at Carroll's Tisbury (Vineyard Haven) Adding an additional modular sorting car to accommodate up to 12 more UPS Trucks at a time. May 24, 2018
620 M4 Morning Glory Farm Vegetable Washing Barn Edgartown Construction of a 1,764 sf footprint barn for washing vegetables. May 24, 2018
165 M Clarion Hotel additional rooms Edgartown To create two (2) additional guest rooms out of the breakfast room. May 24, 2018
617 M Fortune World/ Sweet & Treat Oak Bluffs Food Service Concurrence Review and Landscape Plan June 14, 2018
670 M Lampost Workforce Housing Reconfiguration Oak Bluffs Proposed reconfiguration of workforce housing units on upper floors. June 14, 2018
683 Division Road ANR Edgartown Review of Five (5) lot Form A (ANR) division of property. June 21, 2018
614 M6 Harborview Hotel Modifications Edgartown Modifications to DRI 614: The total square footage reduced by app. 8,000 sf; A 1,620 sf spa on the south side of the main building will be constructed and a 275 sf addition to the function hall; the Mayhew building will remain (rather than 5 smaller cottages) and the exterior of the building will be renovated and exterior porches enclosed;4 of the proposed cottages (Mayhew, Fisher, Penniman and Martin) will not be constructed. The net change in rooms is 26 more than are presently on the property and 29 more than the 2008 approved plan. The parking will increase from the 77 spaces (allowed in 2008) to 97 spaces (same room to parking ratio). The construction will occur in two planned phases. June 21, 2018
665 M MV Museum Tisbury (Vineyard Haven) Modifications to the M.V. Museum site plan based upon adjustments to archaeological features discovered during the excavation and construction process. June 21, 2018

Pages

Office location:

Office location:

The Stone Building
33 New York Avenue
Oak Bluffs, MA 02557

Telephone: 508-693-3453
Fax: 508-693-7894

Mailing Address

Mailing address:

Martha's Vineyard Commission
P.O. Box 1447
Oak Bluffs, MA 02557

Site Map

Copyright

© 2008 - 2019
Martha's Vineyard Commission
All Rights Reserved